Recently, Tianjin Port and Shipping Engineering Co., Ltd. conducted construction tests on embedded bamboo joint piles at a construction site in Tianjin using our company's patented "vibration sinking outer pipe static pulling inner pipe hole making pile technology", also known as the "vibration full casing buried pile construction method". Satisfactory results have been achieved in both pile quality and pile efficiency.
The key equipment of this construction method - EP240 vibrating hammer, due to its infinitely adjustable eccentric torque, can be started and stopped at "zero" to avoid resonance, making the entire pile driving process highly praised by construction users.